CSE8E10-2
8
Connecting to the target board, E8/E8a
IAR C-SPY® Hardware Debugger Systems
User Guide
7 If a dialog box asks you to confirm that the target board is supplied with power, select
the check box and the correct voltage.
Figure 5: The Power Supply dialog box for the E8/E8a emulator
If this dialog box is not displayed, skip this step.
Note: Before you connect the target board to a power supply, check the power
specifications and that there are no short circuits. Incorrect operation might damage the
board and the emulator.
8 If the ID Code verification dialog box is displayed, enter the hexadecimal ID security
code for the flash memory.
Figure 6: The ID Code verification dialog box for the E8/E8a emulator
When the emulator is ready to be used, Connected will be printed in the IAR
Embedded Workbench Debug Log window together with the number of available
hardware and software breakpoints.
MAINTAINING THE CONNECTION TO THE HARDWARE
When a debug session is started, a connection to the hardware is established and an
initialization routine is executed. The initialization sets the emulator options for your
target system.
When you start a debug session with the same hardware as the previous session and
without closing the IDE between the debug sessions, C-SPY can skip the initialization